Dynamic load management: charging more cars without a bigger grid connection
How car parks and residential sites add sockets on a limited grid connection.
A car park's grid connection is usually too small for every socket to run at full power at once. Upgrading the connection is expensive and slow.
How it works
You set the site's total power limit. When a new car plugs in, the software redistributes power across active sockets; the total never exceeds the limit.
Together with the building
With the building meter connected, power for charging rises and falls with the building's live consumption. At night, when the building is quiet, charging speeds up.
Priority and tariffs
Certain sockets or vehicles can get priority, and power can be reduced at peak hours and shifted to the night to cut energy costs.
What you need
Chargers that support OCPP smart charging profiles, which most current AC and DC chargers do.